Please call: +38 (05658) 6-00-80 (81)
Join us:
  • To industrial companies
  • To commercial companies
  • To agricultural companies

INDUSTRIAL OBJECTS

AGRICULTURAL OBJECTS

COMMERCIAL OBJECTS

About us

Using complex solutions of energy efficient engineering systems «ASTRA PROJECT» takes responsibility for ensuring energy efficiency of the object as a whole.

The unique design experience with the use of energy efficient systems, deep knowledge of utilities and building technologies, long-standing business partnership with the world’s leading manufacturers of equipment, massive opportunities of its own material and technical base allow the company to find optimal solutions for each individual project.

Complex solutions are always optimal not only by investment but also by operating costs, by quality and timelines. Close cooperation with main construction, design and building companies allows meeting the challenges of creating engineering systems of any complexity. The company applies the methodology of «lean manufacturing» which provides a systematic reduction of processes and operations not adding value to a final product, strict and systematic coordination of the implementation of all phases of the project. To date, «ASTRA PROJECT» has implemented projects of various sizes and levels of complexity using complex solutions for more than 5370 domestic objects of trade, agriculture and processing industry of Ukraine.

About us in figures

0

Years in the Ukrainian market

0

Completed projects

0

Objects on maintenance service

0

Service teams

Section is not found

Reviews

Cooperation with the company «ASTRA PROJECT» is excellent. We had to start shops at three objects of the corporation “Eurotech” in a very short time after the end of major construction. As usual the installers demonstrated complete professionalism and restraint in cooperation with subcontractors on the site. We are satisfied with the partnership. Thanks to the coordinated work of our companies we managed to open shops in time.

A.N. Pidduda
A.N. Pidduda

Technical director of the corporation «Eurotech»

During the period of cooperation we have accumulated successful experience of joint work which characterizes the company «ASTRA PROJECT» as a reliable business partner incurring its liabilities and having a good team of specialists in the construction of refrigerators and freezers, assembly and installation of cooling systems.

A.V. Matsyuk
A.V. Matsyuk

Director of LLC «Metcom Invest»

It is comfortable to work with specialists of the company «ASTRA PROJECT» servicing refrigeration equipment of our shopping centers “Karavan”. First of all, I would like to underline responsiveness of the service team to a call. Their timely assistance guarantees us quality of our goods and keeps them presentable. We do not let our consumers down. This condition is provided by service teams of the company “ASTRA SERVICE” which are present in all the cities where we have our marketplaces. It is crucial for us. In case of a major accident an extra service team can arrive which is ready to help professionals operating an object.

I.V. Kubyshin
I.V. Kubyshin

Regional development manager of LLC «Advenis»

“Prompt and high quality solution to global problems is the principle of the company “ASTRA PROJECT”. Mobile service teams equipped with materials required for repair are present in all the cities where we have our marketplaces. And it is very important. Since the response and troubleshooting time is minimized. Moreover the good news is the fact that the employees of “ASTRA PROJECT” always offer innovation and advanced technology in cooling systems as well as energy conservation and efficiency of the equipment ...”

V.I. Mazurenko
V.I. Mazurenko

Head of operation and maintenance department of the Shopping Center «METRO» in Nikolayev

In 2013 «ASTRA PROJECT» carried out construction of cooling chambers as well as performed supply, installation and commissioning of refrigeration and recovery systems for two projects: 1) cold-storage warehouse of distribution center No.8 of the company «ATB-Market» (Donetsk region); 2) cold-storage warehouse of distribution center No.13 of the company «ATB-Market» (Crimea). Having qualified engineers and skilled workers the company «ASTRA PROJECT» managed to ensure quality and period of work execution in strict accordance with the Customer’s requirements. The most advanced technologies in the field of energy efficiency were applied.

Yu.G. Zozulya
Yu.G. Zozulya

Director of individual construction service of LLC «Retail-Development»

Do you have questions or suggestions for cooperation?

Leave your phone number and our managers will consult you in the near future

Our news

03

The Hackfest Participants Got Prizes from «ASTRA GROUP»

On March 16-17 on the basis of Dnepropetrovsk installation college refrigeration faculty a hackfest was held a partner of which was the company «ASTRA GROUP».

  Подробнее


03

Нестандартные «ФОРЫ» оснащены холодом

В январе-феврале 2016-го почти одновременно компанией «ASTRA PROJECT» были выполнены работы по оснащению холодом двух магазинов «ФОРА». Первый находится на ул. Туполева в г. Киеве, второй - на ул. Ленина в г. Березань Киевской обл.

  Подробнее


03

We are looking for successful and promising

On March 15 the company «ASTRA GROUP» took part in the Doors Open Day of Dnepropetrovsk University of Chemical Technology. 

  Подробнее


Video

Портфоліо компанії «ASTRA»


Комплексні вирішення енергоефективних систем


Our contacts
  • Address: 37 Titova Str.
    Verkhnedneprovsk
    Dnepropetrovsk region
    51600, Ukraine
  • Tel: +38 (05658) 609-00
  • Tel: +38 (067) 511-0-111
  • Fax: +38 (05658) 6-09-00
  • Mon - Fri: 9:00 - 19:00
    Sat - Sun: Day off
© 1993-2022 «Astra Company»